| - | ===== Examples of Good Practice | + | ===== Netherlands |
| - | ==== Botswana ==== | + | In March of 2019, the Dutch regulator [[https:// |
| + | |||
| + | ===== Botswana | ||
| The regulator in Botswana (BOCRA) publishes a [[https:// | The regulator in Botswana (BOCRA) publishes a [[https:// | ||
| - | ==== West Africa UEMOA ==== | + | ===== West Africa UEMOA ===== |
| In West Africa thanks to a directive in 2006 from UEMOA, the West African regional economic community established a practice of publishing backhaul and interconnection pricing. | In West Africa thanks to a directive in 2006 from UEMOA, the West African regional economic community established a practice of publishing backhaul and interconnection pricing. | ||
| + | |||
| + | ===== Malaysia ===== | ||
| + | |||
| + | https:// | ||