Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
country-profiles:philippines [2020/01/28 22:12] – [Licensing Fees] mabarelacountry-profiles:philippines [2023/06/18 11:59] (current) – CSV data imported steve
Line 15: Line 15:
  
 To be able to operate telecommunications services, an organization will have to first secure a congressional franchise and a certificate of public convenience and necessity (CPCN) which will prove their financial, technical and legal capability to offer the proposed services. On top of this, carriers (including small local operators) also have a number of other licenses they must acquire for operation, including environmental clearance certificates, height clearances, and the local mayor’s permit. All in all, there are as many as 25 permits needed for each cell site. The sheer number of required permits is very difficult for a small entity to complete.  To be able to operate telecommunications services, an organization will have to first secure a congressional franchise and a certificate of public convenience and necessity (CPCN) which will prove their financial, technical and legal capability to offer the proposed services. On top of this, carriers (including small local operators) also have a number of other licenses they must acquire for operation, including environmental clearance certificates, height clearances, and the local mayor’s permit. All in all, there are as many as 25 permits needed for each cell site. The sheer number of required permits is very difficult for a small entity to complete. 
-==== Technical and Administrative Requirements ====+==== Administrative Requirements ====
  
 Lifted from [[http://boi.gov.ph/wp-content/uploads/2018/02/Telecommunications-Infrastructure-January-2018.pdf|Telecommunications-Infrastructure-January-2018.pdf]] Lifted from [[http://boi.gov.ph/wp-content/uploads/2018/02/Telecommunications-Infrastructure-January-2018.pdf|Telecommunications-Infrastructure-January-2018.pdf]]
Line 27: Line 27:
 CPCN, as issued by the NTC, requires carriers to prove that they are technically and financially viable to operate. It contains the description of service, specific rate to be charged for the service and regulations, among others. In granting a CPCN, NTC may impose conditions such as the duration and termination of the privilege, concession, or standard or technical aspects of the equipment, rates, or services. The validity of the CPCN shall not be shorter than 5 years but not longer than the life of the franchise granted. Any expansion/ upgrading/ financing of networks and services aimed at providing additional services to cater to the demand which utilizes equipment compatible to or homologous to previously approved plant and facilities, shall not require any approval by the Commission. CPCN, as issued by the NTC, requires carriers to prove that they are technically and financially viable to operate. It contains the description of service, specific rate to be charged for the service and regulations, among others. In granting a CPCN, NTC may impose conditions such as the duration and termination of the privilege, concession, or standard or technical aspects of the equipment, rates, or services. The validity of the CPCN shall not be shorter than 5 years but not longer than the life of the franchise granted. Any expansion/ upgrading/ financing of networks and services aimed at providing additional services to cater to the demand which utilizes equipment compatible to or homologous to previously approved plant and facilities, shall not require any approval by the Commission.
  
 +
 +==== Licensing Requirements ====
 +
 +In addition to the requirements mentioned above, a radio operator is also subject to file for the following [[http://ncr.ntc.gov.ph/?page_id=1614|permits/licenses]]
 +
 +  - Issuance of Renewal/Modification/Duplicate of Radio Stations in the Fixed and Land Mobile Public Radio Communication Network (CP)
 +  - On-line Importation Process (For Customer Premises equipment with WDN/RFID Module) thru the National Single Windo|w (NSW) System.
 +      - Permit to Import, Release Clearance, Certificate of Exemption.
 +      - Release Clearance.
 +  - Issuance of New/Revalidation/Replacement of STCW Certificate of Competency (COC).
 +      - General Operator Certificate (GOC).
 +      - Radio Electronic Certificate (REC).
 +      - Restricted Radio Operator Certificate – Ship (RROC-Ship).
 +  - Issuance of New/Renewal/Modification/Duplicate of Radio Stations including Temporary Permit for Fixed and Land Mobile Radio Communication Network (CV/CO).
 +      - Private Radio Communication Network (CV) – VHF/UHF, Simplex/Semi-Duplex Mode of transmission.
 +      - Government Radio Communication Network (CO) – VHF/UHF, Simplex/Semi-Duplex Mode of transmission.
 +      - CIVIC Radio Communication Network (CV) – VHF, Simplex Mode of transmission.
 +  - Issuance of Permit to Purchase, Permit to Possess, Construction Permit, Permit to Sell/Transfer, Permit to Transport for Fixed and Land Mobile Service (CV/CP/CO/Amateur).
 +  - Issuance of New/Renewal/Duplicate/Modification of Commercial and Non-Commercial Radio Operator’s Certificate.
 +  - Issuance of New/Renewal/Modification of Domestic Maritime Ship Radio Station (CV/CO) and Domestic Maritime Coastal Radio Station (CV/CP).
 +  - Issuance of Renewal/Modification/Duplicate of International Maritime Ship Radio Stations, Shipboard Stations, Ship Security Alert System (SSAS), Long Ranged Identification and Tracking License (LRIT).
 +  - Issuance of New/Renewal/Modification/Duplicate of Domestic Aircraft and Fixed Radio Stations.
 +  - Issuance of Permit to Purchase, Permit to Possess, Construction Permit, Permit to Sell/Transfer, Permit to transport for Maritime an Aeronautical service.
 +  - Issuance of New/Renewal/Duplicate/Modification Radio Dealer/Manufacturer/Service Center Permits.
 +  - Issuance of New/Renewal/Duplicate/Modification of Customer Premises Accreditation/Mobile Phone Dealer/Mobile Phone Retailer/Reseller/Mobile Phone Service Center Permits.
 +  - Issuance of New/Renewal/Modification/Duplicate of Amateur Radio Station/Radio Operator’s Certificate
 +  - Issuance of Equipment Registration Certificate for WDN Indoor Equipment, Radio Frequency Identification (RFID) Devices and Short Range (SRD) Devices.
 +  - Issuance of Permits and Licenses for Wireless Data Network (WDN/Spread Spectrum) and Broadband Wireless Access (BWA) Networks (new/renewal/modification).
 +
 +<callout type="tip" icon="true">Detailed documentary requirements can be found listed on the [[http://ncr.ntc.gov.ph/?page_id=5901|forms]] for each license/permit.</callout>
  
  
Line 55: Line 85:
 ===== Universal Service ===== ===== Universal Service =====
  
 +On a policy standpoint,  the government recognizes the importance of public telecommunications services.  There is a provision in the Philippine Telecommunication Act (Republic Act 7925) that mandates telcos to give high priority in extending basic services to  unserved areas. Moreover,  it  stipulates  that  "government shall promote a fair,  efficient and responsive market to stimulate the growth and development of the telecommunications facilities and  services  at  affordable  rates."  However,  there  are  no  existing guidelines to implement the said provision of the law. 
 ===== Cooperatives ===== ===== Cooperatives =====
  
Line 73: Line 104:
  
 ---- struct data ---- ---- struct data ----
 +countryprofile.regName : National Telecommunications Commission
 +countryprofile.regAcronym : NTC
 +countryprofile.regUrl : http://ntc.gov.ph/
 +countryprofile.regTwitter : https://twitter.com/NTC_PH
 +countryprofile.regEmail : regulation@ntc.gov.ph
 +countryprofile.minName : Department of Information and Communications Technology
 +countryprofile.minAcronym : DICT
 +countryprofile.minUrl : www.dict.gov.ph
 +countryprofile.minTwitter : https://twitter.com/dictgovph
 +countryprofile.minEmail : information@dict.gov.ph
 ---- ----