Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
country-profiles:philippines [2020/01/28 22:03] – [Backhaul] mabarelacountry-profiles:philippines [2023/06/18 11:59] (current) – CSV data imported steve
Line 15: Line 15:
  
 To be able to operate telecommunications services, an organization will have to first secure a congressional franchise and a certificate of public convenience and necessity (CPCN) which will prove their financial, technical and legal capability to offer the proposed services. On top of this, carriers (including small local operators) also have a number of other licenses they must acquire for operation, including environmental clearance certificates, height clearances, and the local mayor’s permit. All in all, there are as many as 25 permits needed for each cell site. The sheer number of required permits is very difficult for a small entity to complete.  To be able to operate telecommunications services, an organization will have to first secure a congressional franchise and a certificate of public convenience and necessity (CPCN) which will prove their financial, technical and legal capability to offer the proposed services. On top of this, carriers (including small local operators) also have a number of other licenses they must acquire for operation, including environmental clearance certificates, height clearances, and the local mayor’s permit. All in all, there are as many as 25 permits needed for each cell site. The sheer number of required permits is very difficult for a small entity to complete. 
-==== Technical and Administrative Requirements ====+==== Administrative Requirements ====
  
 Lifted from [[http://boi.gov.ph/wp-content/uploads/2018/02/Telecommunications-Infrastructure-January-2018.pdf|Telecommunications-Infrastructure-January-2018.pdf]] Lifted from [[http://boi.gov.ph/wp-content/uploads/2018/02/Telecommunications-Infrastructure-January-2018.pdf|Telecommunications-Infrastructure-January-2018.pdf]]
Line 28: Line 28:
  
  
 +==== Licensing Requirements ====
  
-==== Licensing Fees ====+In addition to the requirements mentioned above, a radio operator is also subject to file for the following [[http://ncr.ntc.gov.ph/?page_id=1614|permits/licenses]]
  
-===== Current Spectrum Assignment =====+  - Issuance of Renewal/Modification/Duplicate of Radio Stations in the Fixed and Land Mobile Public Radio Communication Network (CP) 
 +  - On-line Importation Process (For Customer Premises equipment with WDN/RFID Module) thru the National Single Windo|w (NSW) System. 
 +      - Permit to Import, Release Clearance, Certificate of Exemption. 
 +      - Release Clearance. 
 +  - Issuance of New/Revalidation/Replacement of STCW Certificate of Competency (COC). 
 +      - General Operator Certificate (GOC). 
 +      - Radio Electronic Certificate (REC). 
 +      - Restricted Radio Operator Certificate – Ship (RROC-Ship). 
 +  - Issuance of New/Renewal/Modification/Duplicate of Radio Stations including Temporary Permit for Fixed and Land Mobile Radio Communication Network (CV/CO). 
 +      - Private Radio Communication Network (CV) – VHF/UHF, Simplex/Semi-Duplex Mode of transmission. 
 +      - Government Radio Communication Network (CO) – VHF/UHF, Simplex/Semi-Duplex Mode of transmission. 
 +      - CIVIC Radio Communication Network (CV) – VHF, Simplex Mode of transmission. 
 +  - Issuance of Permit to Purchase, Permit to Possess, Construction Permit, Permit to Sell/Transfer, Permit to Transport for Fixed and Land Mobile Service (CV/CP/CO/Amateur). 
 +  - Issuance of New/Renewal/Duplicate/Modification of Commercial and Non-Commercial Radio Operator’s Certificate. 
 +  - Issuance of New/Renewal/Modification of Domestic Maritime Ship Radio Station (CV/CO) and Domestic Maritime Coastal Radio Station (CV/CP). 
 +  - Issuance of Renewal/Modification/Duplicate of International Maritime Ship Radio Stations, Shipboard Stations, Ship Security Alert System (SSAS), Long Ranged Identification and Tracking License (LRIT). 
 +  - Issuance of New/Renewal/Modification/Duplicate of Domestic Aircraft and Fixed Radio Stations. 
 +  - Issuance of Permit to Purchase, Permit to Possess, Construction Permit, Permit to Sell/Transfer, Permit to transport for Maritime an Aeronautical service. 
 +  - Issuance of New/Renewal/Duplicate/Modification Radio Dealer/Manufacturer/Service Center Permits. 
 +  - Issuance of New/Renewal/Duplicate/Modification of Customer Premises Accreditation/Mobile Phone Dealer/Mobile Phone Retailer/Reseller/Mobile Phone Service Center Permits. 
 +  - Issuance of New/Renewal/Modification/Duplicate of Amateur Radio Station/Radio Operator’s Certificate 
 +  - Issuance of Equipment Registration Certificate for WDN Indoor Equipment, Radio Frequency Identification (RFID) Devices and Short Range (SRD) Devices. 
 +  - Issuance of Permits and Licenses for Wireless Data Network (WDN/Spread Spectrum) and Broadband Wireless Access (BWA) Networks (new/renewal/modification).
  
-==== Technical and Administrative Requirements ====+<callout type="tip" icon="true">Detailed documentary requirements can be found listed on the [[http://ncr.ntc.gov.ph/?page_id=5901|forms]] for each license/permit.</callout>
  
-=== Licensed === 
  
-== Access Networks == 
  
-^ **Operator**  ^ **800MHz**  ^ **900MHz**  ^ **1800MHz**  ^ **2100MHz**  ^ **2600MHz**  ^ **3500MHz** ^  +===== Current Spectrum Assignment =====
-| XYZcom        | None        |  2x10        2x15        |  2x10        |  None        |  None       | +
- +
-== PtP Networks == +
- +
-=== License-Exempt === +
- +
-== Access Networks == +
-^ **Frequency**      ^ **Power Limit**  ^ **Transmit Power** +
-| //2.4GHz//                         || +
-| 2400 – 2483.5 MHz  | ''2.4EIRP''     || +
-| //5GHz//                       || +
-| 5150-5250 MHz      | ''5.1EIRP''     || +
-| 5250-5350 MHz      | ''5.2EIRP''     || +
-| 5470-5725 MHz      | ''5.4EIRP''     || +
-| 5725-5800 MHz      | ''5.8EIRP''     || +
- +
-== PtP Networks == +
- +
-^ **Frequency**      ^ **Power Limit**  ^ **Transmit Power** +
-| //2.4GHz//                         || +
-| 2400 – 2483.5 MHz  | ''2.4EIRP''     || +
-| //5GHz//                       || +
-| 5150-5250 MHz      | ''5.1EIRP''     || +
-| 5250-5350 MHz      | ''5.2EIRP''     || +
-| 5470-5725 MHz      | ''5.4EIRP''     || +
-| 5725-5800 MHz      | ''5.8EIRP''     || +
- +
- +
-=== Secondary Use === +
  
-== Access Networks == 
-== PtP Networks == 
  
 ==== Spectrum Fees / Costs ==== ==== Spectrum Fees / Costs ====
Line 95: Line 85:
 ===== Universal Service ===== ===== Universal Service =====
  
 +On a policy standpoint,  the government recognizes the importance of public telecommunications services.  There is a provision in the Philippine Telecommunication Act (Republic Act 7925) that mandates telcos to give high priority in extending basic services to  unserved areas. Moreover,  it  stipulates  that  "government shall promote a fair,  efficient and responsive market to stimulate the growth and development of the telecommunications facilities and  services  at  affordable  rates."  However,  there  are  no  existing guidelines to implement the said provision of the law. 
 ===== Cooperatives ===== ===== Cooperatives =====
  
Line 113: Line 104:
  
 ---- struct data ---- ---- struct data ----
 +countryprofile.regName : National Telecommunications Commission
 +countryprofile.regAcronym : NTC
 +countryprofile.regUrl : http://ntc.gov.ph/
 +countryprofile.regTwitter : https://twitter.com/NTC_PH
 +countryprofile.regEmail : regulation@ntc.gov.ph
 +countryprofile.minName : Department of Information and Communications Technology
 +countryprofile.minAcronym : DICT
 +countryprofile.minUrl : www.dict.gov.ph
 +countryprofile.minTwitter : https://twitter.com/dictgovph
 +countryprofile.minEmail : information@dict.gov.ph
 ---- ----